Project Overview
This residential project in Nakuru required coordinated plumbing & drainage networks planning from design through commissioning.
Our team aligned technical submissions, installation sequencing, and quality checks so delivery stayed compliant and operationally practical.
Detailed interface coordination across MEP and specialist systems
Site supervision, testing, and corrective action tracking
Structured handover with documented as-built and commissioning records
Scope
Replaced aging water distribution and drainage sections, including pressure controls and leak-risk correction works.
Outcome
Residents experienced more stable water pressure and reduced drainage faults after phased corrective upgrades.