Project Overview
This industrial project in Machakos required coordinated industrial mechanical utilities planning from design through commissioning.
Our team aligned technical submissions, installation sequencing, and quality checks so delivery stayed compliant and operationally practical.
Detailed interface coordination across MEP and specialist systems
Site supervision, testing, and corrective action tracking
Structured handover with documented as-built and commissioning records
Scope
Upgraded process utility piping, ventilation extraction, and service isolation controls to stabilize production uptime.
Outcome
Utility interruptions reduced significantly and maintenance teams gained safer isolation points for planned servicing.